Realizations


Project - Ramirent technology in the construction of a new district in Bratislava's downtown
23.10.2025

Ramirent technology in the construction of a new district in Bratislava's downtown

The Geda BL 200 construction elevator technology was used in the project of the developer Penta Real Estate, concerning the construction of a modern residential complex Chalupkova, located in a lucrative part of the new Bratislava downtown. The elevator was deployed for the efficient and safe movement of materials during construction, thus significantly contributing to the smooth progress of construction work and the optimization of work processes on the site.

Project - Ramirent at Grape 2025
11.08.2025

Ramirent at Grape 2025

This year, too, Ramirent contributed to the preparations for the Grape festival at the Trenčín airport.

Project - Tunnel Višňové
05.08.2025

Tunnel Višňové

Ramirent provided technical support in the form of machine rental during construction work on the longest tunnel in Slovakia.

Project - Big Summer Fest 2025
04.08.2025

Big Summer Fest 2025

For Big Summer Fest 2025, Ramirent provided the technical infrastructure necessary for the smooth running of the event so that visitors can enjoy an unforgettable summer experience.

Project - CIBULA FEST 2025
22.07.2025

CIBULA FEST 2025

Ramirent participated in the supply and implementation of the technical facilities at the Holíč Airport area during the Cibula Fest.

Project - Pohoda festival 2025
15.07.2025

Pohoda festival 2025

At Trenčín Airport, Ramirent provided behind-the-scenes technical solutions that helped prepare for the Pohoda 2025 festival.

Project - Project Vaillant – Senica 2022 – 2024
07.07.2025

Project Vaillant – Senica 2022 – 2024

Project - The reconstruction of the Sitno Forest Resort
05.05.2025

The reconstruction of the Sitno Forest Resort

A Ramirent cargo construction elevator was used in the reconstruction of the Sitno Forest Resort hotel.

Project - Volvo Valaliky
24.07.2024

Volvo Valaliky